{"id":667,"date":"2026-05-11T00:41:18","date_gmt":"2026-05-11T00:41:18","guid":{"rendered":"https:\/\/shuipoagi.com\/?post_type=product&#038;p=667"},"modified":"2026-05-14T03:59:29","modified_gmt":"2026-05-14T03:59:29","slug":"collaborative-robot-workstation","status":"publish","type":"product","link":"https:\/\/shuipoagi.com\/vi\/product\/collaborative-robot-workstation\/","title":{"rendered":"M\u00e1y tr\u1ea1m Robot c\u1ed9ng t\u00e1c"},"content":{"rendered":"<h5>Function Description<\/h5>\n<p>Designed for the automated welding of products such as steel structures, specialized vehicle components, and construction machinery parts, this system supports human-robot collaboration, drag-and-drop teaching, and graphical programming. It is adaptable to various welding scenarios\u2014including long seams, continuous welds, and complex-angle joints\u2014and, when paired with designated welding equipment, achieves high-precision, high-consistency results. By replacing traditional manual welding, it significantly boosts both production efficiency and weld quality.<\/p>\n<h5>Product Features<\/h5>\n<p>1. Featuring a 6-axis collaborative design, a payload capacity of 10 kg, and a maximum reach of 1400 mm, it covers a wide range of welding operations and is well-suited for the welding requirements of various medium-to-large workpieces.<br \/>\n2. With a repeat positioning accuracy of \u00b10.05 mm, it ensures uniform and highly consistent weld bead formation, thereby effectively reducing the rate of welding defects.<br \/>\n3. Equipped with a safety collision detection function, it enables fence-free human-robot collaborative operation and adapts flexibly to compact workshop layouts.<br \/>\n4. Constructed from a lightweight aluminum alloy body weighing only 45 kg, it offers flexible deployment and allows for easy adjustment of installation positions to meet production line requirements.<br \/>\n5. Featuring a rich array of interfaces, it integrates seamlessly with the MEGMEET CM500R welder, the Shuibo 500A water-cooled welding torch, and other peripheral equipment, ensuring robust system interoperability.<\/p>\n<h5>Technical Parameters<\/h5>\n<div style=\"overflow-x: auto; width: 100%;\">\n<table style=\"width: 100%; border-collapse: collapse;\">\n<tbody>\n<tr>\n<th align=\"left\">No.<\/th>\n<th align=\"left\">Item<\/th>\n<th align=\"left\">Technical Parameters<\/th>\n<\/tr>\n<tr>\n<td align=\"left\">1<\/td>\n<td align=\"left\">Model<\/td>\n<td align=\"left\">SP-E10L-1400<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">2<\/td>\n<td align=\"left\">Rated Load<\/td>\n<td align=\"left\">10kg<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">3<\/td>\n<td align=\"left\">Maximum Reach<\/td>\n<td align=\"left\">1400mm<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">4<\/td>\n<td align=\"left\">Degrees of Freedom<\/td>\n<td align=\"left\">6 Axes<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">5<\/td>\n<td align=\"left\">Repeat Positioning Accuracy<\/td>\n<td align=\"left\">\u00b10.05mm<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">6<\/td>\n<td align=\"left\">Robot Weight<\/td>\n<td align=\"left\">45kg<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">7<\/td>\n<td align=\"left\">Protection Grade<\/td>\n<td align=\"left\">IP54<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">8<\/td>\n<td align=\"left\">Installation Method<\/td>\n<td align=\"left\">Mobile Cart<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">9<\/td>\n<td align=\"left\">Power Supply<\/td>\n<td align=\"left\">200-240V~380V AC, 50\/60Hz<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">10<\/td>\n<td align=\"left\">Joint Motion Range<\/td>\n<td align=\"left\">J1, J4, J6: \u00b1360\u00b0; J2: \u00b1135\u00b0; J3: \u00b1153\u00b0; J5: \u00b1180\u00b0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h5>Key Components<\/h5>\n<div style=\"overflow-x: auto; width: 100%;\">\n<table style=\"width: 100%; border-collapse: collapse;\">\n<tbody>\n<tr>\n<th align=\"left\">No.<\/th>\n<th align=\"left\">Description<\/th>\n<th align=\"left\">Brand<\/th>\n<\/tr>\n<tr>\n<td align=\"left\">1<\/td>\n<td align=\"left\">Collaborative Robot Body<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">2<\/td>\n<td align=\"left\">Welding Power Source<\/td>\n<td align=\"left\">Megmeet<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">3<\/td>\n<td align=\"left\">Electric Control System<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">4<\/td>\n<td align=\"left\">Teach Pendant<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">5<\/td>\n<td align=\"left\">Water-Cooled Welding Torch<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">6<\/td>\n<td align=\"left\">Water Cooling Unit<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">7<\/td>\n<td align=\"left\">Handle<\/td>\n<td align=\"left\">SHUIPO<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">8<\/td>\n<td align=\"left\"><em>Subject to replacement with equivalent brand for special reasons<\/em><\/td>\n<td align=\"left\">&#8211;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h5>Scope of Supply<\/h5>\n<p>1. Collaborative Robot Body: 1 Unit 2. Electrical Control Cabinet: 1 Unit 3. Megmeet Welder (including Wire Feeder): 1 Set 4. 500A Water-Cooled Welding Torch: 1 Set 5. Workstation Base Cart: 1 Unit 6. Standard 10-Meter Power Cable<\/p>\n<h4>Working Environment and Workpiece Requirements<\/h4>\n<h5>Work Environment<\/h5>\n<div style=\"overflow-x: auto; width: 100%;\">\n<table style=\"width: 100%; border-collapse: collapse;\">\n<tbody>\n<tr>\n<th align=\"left\">No.<\/th>\n<th align=\"left\">Item<\/th>\n<th align=\"left\">Requirement<\/th>\n<\/tr>\n<tr>\n<td align=\"left\">1<\/td>\n<td align=\"left\">Location<\/td>\n<td align=\"left\">Indoor (no nearby electrical noise sources)<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">2<\/td>\n<td align=\"left\">Ambient Temperature<\/td>\n<td align=\"left\">-5\u00b0C ~ 45\u00b0C<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">3<\/td>\n<td align=\"left\">Ambient Humidity<\/td>\n<td align=\"left\">20%\u201380% RH (non-condensing)<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">4<\/td>\n<td align=\"left\">Vibration<\/td>\n<td align=\"left\">Vibration acceleration &lt; 0.5g<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">5<\/td>\n<td align=\"left\">Flammable Gas<\/td>\n<td align=\"left\">None<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">6<\/td>\n<td align=\"left\">Corrosive Gas<\/td>\n<td align=\"left\">None<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">7<\/td>\n<td align=\"left\">Power Supply<\/td>\n<td align=\"left\">3-phase AC 380V \u00b15%, 50Hz\u201360Hz<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">8<\/td>\n<td align=\"left\">Altitude<\/td>\n<td align=\"left\">\u2264 1000 meters<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This working environment does not include purchased parts with special requirements.<\/p>\n<h5>Workpiece Requirements<\/h5>\n<p>Within four days of the contract signing, the Buyer shall provide detailed drawings of the workpiece. The dimensions of the product parts must conform to the drawing specifications, and the dimensional consistency tolerance between parts shall not exceed \u00b11 mm.<br \/>\nThe surfaces of the parts must be free of oil, rust, and contaminants.<br \/>\nThe parts shall be free of any burrs that could interfere with positioning, clamping, or welding.<\/p>\n<h4>Equipment Installation<\/h4>\n<h5>Foundation Drawings<\/h5>\n<p>Within two weeks after the contract is signed and becomes effective, the Supplier shall provide one set of general layout drawings, foundation drawings, and drawings for parts to be fabricated by the Purchaser (for construction purposes) for each individual piece of equipment.<br \/>\nIf the Purchaser fails to construct the foundations within five months of signing the contract, they must contact the Company prior to commencing foundation work again. This is necessary to prevent issues arising from equipment updates or outdated foundation drawings that could render the foundations incompatible with the equipment during installation.<\/p>\n<h5>Responsibilities of the Purchaser<\/h5>\n<p>The equipment installation site shall be cleared and prepared.<br \/>\nPersonnel designated by the Purchaser to participate in the installation and commissioning processes shall be in place.<br \/>\nAll utilities\u2014including water, electricity, and gas\u2014shall be connected and routed to the corresponding connection points\/switches on the equipment supplied by the Supplier.<br \/>\nThe installation foundations and embedded parts shall be constructed in advance in accordance with the foundation drawings provided by the Supplier; the completed foundations must fully meet the installation requirements of the Supplier&#8217;s equipment.<br \/>\nThe Purchaser is responsible for the installation of the equipment and its associated accessories, ensuring that the installation meets the Supplier&#8217;s operational requirements and installation standards. The Supplier shall provide guidance and assistance during the equipment installation process.<br \/>\nThe Purchaser shall prepare at least three samples (or sets of samples) for commissioning and testing purposes.<br \/>\nThe Purchaser shall provide necessary facilities and conveniences to the Supplier&#8217;s personnel during the equipment installation, commissioning, and maintenance periods.<\/p>\n<h5>\u00a0Responsibilities of the Purchaser<\/h5>\n<p>The equipment installation site shall be cleared and prepared.<br \/>\nPersonnel designated by the Purchaser to participate in the installation and commissioning processes shall be in place.<br \/>\nAll utilities\u2014including water, electricity, and gas\u2014shall be connected and routed to the corresponding connection points (switches) on the equipment supplied by the Supplier.<br \/>\nThe installation foundation, embedded parts, and similar elements shall be constructed in advance in accordance with the foundation drawings provided by the Supplier; the completed foundation must fully comply with the installation requirements of the Supplier&#8217;s equipment.<br \/>\nThe Purchaser shall be responsible for the installation of the equipment and its associated accessories, ensuring that said installation meets the operational requirements and installation standards specified by the Supplier. The Supplier shall provide guidance and assistance during the equipment installation process.<br \/>\nThe Purchaser shall prepare at least three (3) samples (or sets of samples) for commissioning purposes.<br \/>\nThe Purchaser shall facilitate the Supplier&#8217;s work during the equipment installation, commissioning, and maintenance phases.<\/p>\n<h5>Project Scope Definition<\/h5>\n<div style=\"overflow-x: auto; width: 100%;\">\n<table style=\"width: 100%; border-collapse: collapse;\">\n<tbody>\n<tr>\n<th align=\"left\">No.<\/th>\n<th align=\"left\">Category<\/th>\n<th align=\"left\">Scope of Work<\/th>\n<th align=\"left\">Buyer<\/th>\n<th align=\"left\">Seller<\/th>\n<\/tr>\n<tr>\n<td align=\"left\">1<\/td>\n<td align=\"left\">Electrical<\/td>\n<td align=\"left\">Power grid to workshop distribution room<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Workshop substation to Seller\u2019s equipment control cabinet (primary wiring)<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Seller\u2019s equipment control cabinet to each power consumption point (secondary wiring)<\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">\u25b3<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">2<\/td>\n<td align=\"left\">Compressed Air<\/td>\n<td align=\"left\">Air compressor station<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Secondary air treatment components<\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">\u25b3<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Pipeline from air compressor station to equipment air inlet<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Internal piping at equipment air inlet<\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">\u25b3<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">3<\/td>\n<td align=\"left\">Civil &amp; General Works<\/td>\n<td align=\"left\">Civil works including workshop floor, equipment foundations, plus pre-embedded steel plates, rails, cable tray covers, and cable supports in trays<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Factory heating, lighting, fire protection, and ventilation systems<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\">4<\/td>\n<td align=\"left\">Miscellaneous<\/td>\n<td align=\"left\">Temporary water, power, welding machine consumables required for installation<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">Water, power, gas, lubricating oil, and hydraulic oil required for commissioning<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><\/td>\n<td align=\"left\"><\/td>\n<td align=\"left\">All fees and regulations related to environmental protection, fire safety, and hygiene acceptance<\/td>\n<td align=\"left\">\u25b3<\/td>\n<td align=\"left\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Supplier is responsible for providing the design requirements\u2014including drawings for equipment foundations, embedded parts, utility piping, and power cabling\u2014for all welding stations. This excludes civil engineering design and construction; the Purchaser shall ensure that appropriate waterproofing and anti-settlement measures are implemented during their civil construction work.<\/p>\n<h4>After-Sales Service and Personnel Training<\/h4>\n<p>The warranty period shall extend for 12 months, commencing from the date on which the contracted equipment is installed, commissioned, and successfully accepted at the Buyer&#8217;s facility.<br \/>\nShould any product quality issues arise during the warranty period, the Buyer shall not dismantle or attempt to repair the equipment without authorization. Instead, the Buyer must first contact the Supplier. Once the Supplier confirms that the issue stems from a product quality defect, the Supplier shall assume full responsibility for resolving the problem, and all associated costs shall be borne by the Supplier.<br \/>\nUpon the expiration of the warranty period, the Supplier shall prioritize the supply of spare parts and services to the Buyer on preferential terms.<\/p>\n<h5>Post-Warranty Services<\/h5>\n<p>Following the expiration of the warranty period, the Supplier shall provide repair and maintenance services on a fee-for-service basis. Should the purchase or replacement of spare parts be required, the Supplier shall prioritize offering these parts to the Buyer at cost price; shipment of parts shall be arranged only after payment has been received.<\/p>\n<h5>Personnel Training<\/h5>\n<p>1. The Supplier is responsible for providing training to the Buyer&#8217;s equipment operators or maintenance personnel. All trainees designated by the Buyer must possess an educational background equivalent to or higher than a high school or vocational school diploma, as well as basic knowledge and skills in mechanics, equipment adjustment and operation, and system control.<br \/>\n2. The objective of the training is to ensure that the Buyer&#8217;s trainees acquire a sufficient understanding of the machine tool&#8217;s performance and basic troubleshooting procedures, thereby enabling them to independently master all requirements regarding operation, adjustment, and maintenance.<br \/>\n3. Following the purchase of the equipment, free training is limited to two (2) personnel per machine. The training session shall take place over two (2) days immediately following the completion of the equipment&#8217;s installation and commissioning. The training methodology shall combine theoretical instruction with practical application, and the training venue shall be the Buyer&#8217;s equipment site.<br \/>\n4. The training curriculum shall include: robot operation and programming; parameter adjustment for the Megmeet Ehave2 CM500R welding machine; maintenance of the Shuibo 500A water-cooled welding torch; equipment fault diagnosis and troubleshooting; and daily maintenance procedures.<br \/>\n5. Upon the conclusion of the training session, the Supplier shall conduct an assessment of the trainees. Once the trainees have successfully passed the assessment, both the relevant supervising manager and the individual trainee shall sign to acknowledge and confirm the completion of the training.<\/p>\n<p><iframe title=\"2026\u5e745\u670814\u65e5\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/L8lK5xK3LLo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p><iframe title=\"2026\u5e745\u670814\u65e5\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/jPjrqkkLA5U?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p><iframe title=\"2026\u5e745\u670814\u65e5\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/92xTQmPVZtQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>This product is designed for the automated welding of steel structures, special vehicle components, engineering machinery parts, and other related products. It supports human-robot collaboration, drag-and-drop teaching, and graphical programming, and is adaptable to long seams, continuous welding, and complex-angle welding scenarios. When paired with specified welding equipment, it enables high-precision, high-consistency welding, replacing traditional manual welding to enhance production efficiency and weld quality.<\/p>","protected":false},"featured_media":279,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[15],"product_tag":[],"class_list":{"0":"post-667","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-uncategorized","8":"first","9":"instock","10":"shipping-taxable","11":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/product\/667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/comments?post=667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/media\/279"}],"wp:attachment":[{"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/media?parent=667"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/product_brand?post=667"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/product_cat?post=667"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/shuipoagi.com\/vi\/wp-json\/wp\/v2\/product_tag?post=667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}